San Diego VA Hospital - 4.6 MW CHP System - Case Study
Quick Facts LOCATION: San Diego, CA MARKET SECTOR: Hospital FACILITY SIZE: 1,030,000 square feet FACILITY PEAK LOAD: 6.8 MW EQUIPMENT: 4.6 MW Solar Turbines Mercury™ 50 gas turbine, absorption chiller FUEL: Natural Gas USE OF THERMAL ENERGY: Space and autoclave heating, absorption chilling and domestic hot water CHP TOTAL EFFICIENCY: 64% ENVIRONMENTAL BENEFITS: Less than 5ppm NOx TOTAL ...