Testing and Maintenance Services

SHARE

In healthcare facilities, NFPA requires regular testing of isolated power systems to ensure they are in peak condition, keeping patients and staff safe. Bender offers a complete range of services to validate the state of these systems and ensure certification of meeting NFPA, NEC, and JCAHO regulations and standards.

Most popular related searches

Per NFPA 99:2015 Article 6.3.4.1.5, facilities must perform testing using external simulated faults after any system modification, repair, or renovation. Bender field service technicians provide recertification testing for any manufacture and model of Isolated Power. Although a facility can perform its own “in-house” testing on their LIMs (Line Isolation Monitors) utilizing a Bender LIM tester, this is not recommended due to the infrequency of testing needed and tools required to test correctly. It is recommended to use in-house testing to supplement the more thorough testing performed by a qualified, reputable service provider.

On-site start-up commissioning and LIM recertification and testing by a Bender technician is offered with all equipment sales for new installations. Bender offers an exclusive 5-year warranty on qualifying IPS (Isolated Power System) components, which is applied based upon successful commissioning by a Bender certified technician.

For new installation, please refer to the Site Readiness Pre-Checklist for instructions to ensure proper preparation prior to field service technician dispatch to the site.